| Section 2.. |
| TECHNICAL SPECIFICATIONS
CHLOROGEN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| NOTE : The Chlorine production may vary with the salt Quality and Voltage Input. |
|
| Section 3.. |
THEORY OF ELECTROLYSIS
(HOW CHLORINE IS PRODUCED BY
CHLOROGEN) |
|
| Section 4.. |
INITIAL INSPECTION |
Generally the Chlorogen is supplied in Three Parts
:
|
|
| Section 5.. |
LOCATION OF PLANT |
| While selecting the location of the Plant the following should be taken Care : |
|
|
| Section 6.. |
INSTALLATION AND COMMISSIONING |
|
COMMISSIONING.
CAUTION.
|
|
| Section 7.. |
MAINTAINANCE |
|
EVERY THREE MONTHS
NOTE :
|
|
| Section 8.. |
TROUBLE SHOOTINGS |
|
|
| Section 9.. |
GUARANTEE |
WATER CHEM CORPORATION
WATER CHEM CORPORATION
|
|
|
| Section 10.. |
CHLORINE
ESTIMATION
(IODOMETRIC WAY)
(NOT IN OUR SCOPE OF SUPPLY) |
|
Procedure :-
NOTES / CAUTION
|
|
| Concentration of Active Chlorine(mg/L) |
Normality of Na2S2O3(N) |
Volume of Sample Solution(Y ml) |
|
|
| Section 11.. |
RECTIFIER |
INSTALLATION
UNPACKING
PREPARE FOR USE AND INSTALLATION
INITIAL INSPECTION
PHYSICAL CHECK
ELECTRICAL CHECK
INSTALLATION :
|
|
|
|
Step One :-
Step Two :-
Result :-
Step Three:-
Result :-
Step Four :-
Step Five:-
Step Six:-
|
 |
|