Chlorogen-100-CM..
 
WELCOME GENTELMAN
 
The Chlorogen has following Components :-
Section 2..
TECHNICAL SPECIFICATIONS CHLOROGEN
MODEL   : CGN - 100 -(T)
CHLORINE PRODUCTION PER HOUR   : 980gm / Batch (Approx.)
PROCESS   : Batch
CONCENTRATION OF CHLORINE   : 7gm/Ltr ( Approx. )
SALT CONSUMPTION   : 4.5 Kg Per Batch
ELECTRICITY CONSUMPTION   : 4.5 KWH Per Kg of Chlorine
AC INPUT POWER TO RECTIFIER   : 220 Volt , Single Phase
DC OUTPUT FROM RECTIFIER TO CELL   : 100 Amps - 12 Volts
NO OF BRINE TANK / PROCESS   : One
QUANTITY OF HYPO GENERATED   : 140 Ltrs
NOTE : The Chlorine production may vary with the salt Quality and Voltage Input.
Section 3..
THEORY OF ELECTROLYSIS
(HOW CHLORINE IS PRODUCED BY CHLOROGEN)

On passing a direct current through an aqueous solution of sodium chloride (Nacl), which is totally dissociated to Na+ and Cl.

2 Cl- --------------> Cl2 + 2e

2 H2O + 2e  - -----------------> 2 OH  -+ H2

2 NaOH + Cl2 ------> Naocl + Nacl + H2O

Section 4..
INITIAL INSPECTION

Generally the Chlorogen is supplied in Three Parts :

Section 5..
LOCATION OF PLANT
While selecting the location of the Plant the following should be taken Care :
Section 6..
INSTALLATION AND COMMISSIONING

3-  Connect Leads from Rectifier to Cell Pack as Shown Below.


+ i.e. Positive is Taped - Red .

COMMISSIONING.

CAUTION.

After the machine is stopped the Cell Pack Electrolyser should be cleaned
with fresh water through the Existing cleaning System Valve.

Section 7..
MAINTAINANCE

EVERY THREE MONTHS

1) Check Various Valves and Pipes replace if damaged.
2) Remove Electrolyser , Dismantle and wash with water and soft cloth .

   In case any Scale Deposits On anode or Cathode are observed Dip Both  in a solution of dilute HCL and water (1:6) and rewash. While assembling it again check Teflon sealing Rings and Buttons if worn out or dis-shaped Replace them.


NOTE :
The duration of each shut down for Total cleaning of Electrolyser will depend on the quality of salt and water used.

Section 8..
TROUBLE SHOOTINGS
  TROUBLING POINTS
------------------------------------------------------------------------------------------------------------------------
Section 9..
GUARANTEE

WATER CHEM CORPORATION guarantees the equipment included in the Scope of supply to be of First class workmanship with best Quality of Available materials. All components Supplied will be Brand new and made using high tech manufacturing processes.

WATER CHEM CORPORATION Provides a Guarantee as to the mechanical portion of the machine for a period of 12 Calendar months from date of Installation Or 18 Months from date of despatch which ever period ends earlier.

------------------------------------------------------------------------------------------------------------------------
Section 10..
CHLORINE ESTIMATION
(IODOMETRIC WAY)
(NOT IN OUR SCOPE OF SUPPLY)
(NOT TO BE SUPPLY BY US)

Procedure :-

NOTES / CAUTION

y = Sample amount

Concentration of Active Chlorine(mg/L)  Normality of Na2S2O3(N)  Volume of Sample  Solution(Y ml)
------------------------------------------------------------------------------------------------------------------------
Section 11..
RECTIFIER

INSTALLATION

UNPACKING
The Power Supply is wrapped in a polythene cover and inserted in a corrugated carton of larger size with adequate padding inserts , made up of corrugated paper , on all the sides. This primary packing is packed inside a secondary packing of wooden case with adequate materials on all sides. For unpacking, ( a ) Open the wooden case , (b) Remove the carton , ( c ) Remove the Power Supply from carton , (d) Remove all paddings (e) Unwrap the polythene cover ,(f) Inspect the material for physical damage, if any , (g) Save all the packing material until inspection in completed. If damage is found notify the carriers immediately. Also notify US about it.

PREPARE FOR USE AND INSTALLATION

INITIAL INSPECTION
Inspect for any damage as soon as Power supply is unpacked. Notify the carriers if any , damage is observed.

PHYSICAL CHECK
Confirm that there are no broken knobs or connectors , that the cabinets and panel surfaces are free from dents and scratches and the meters are not scratched or cracked.

ELECTRICAL CHECK
Check the Power Supply against its electrical specs. An In-cabinet performance check will verify the proper operation of the power Supply.

INSTALLATION :
The Unit is despatched ready for floor mounting operation. It is necessary only to connect the unit to a rated source of power and it is ready for operation. Install it, where enough ventilation is available. Surrounding is neat and clean. The ambient of area around should be between 10 deg C. to 42 deg C.

 
TECHNICAL SPECIFICATIONS

Step One :- Install the Rectifier according to the guidelines provided in the manual. Select a suitable electrical outlet of 15 amps. Check for loose or sparking electrical connection. Put the plug into the Socket firmly. Adjust the Rectifier unit in such a manner that the mains wire remains loose.

Step Two :- After being sure about the electrical connection, put the mains On/Off Switch /M.C.B (Part No.1 in the Diagram of 10012 CGR) in the right direction to on the UNIT.

Result :- The A.C. ON. L.E.D. will begin to below Red. The Buzzer will be ON and a continuous chriping sound will be generated. The exhaust fans fitted inside the Rectifier unit will start :

Step Three:- The next step is to put on the Timer On/Off Switch (Indicated as Part No.2 in the Diagram).

Result :- The Timer (Indicated as Part No.3 in the Diagram) will be activated. The digits will start to glow.

Step Four :- Now, please examine the display of timer. It should indicate Zero's. There is a thumb wheel selector on the timer. Please insure that the thumb wheel selector is set to 480 minutes. After adjusting the thumb wheel switches to 480 minutes, the Timer Reset Switch is to be pushed. The Timer Reset Switch has been indicated as Part No.4 in the Diagram.

Step Five:- Next Step is to look at the Digital Panel Meters, indicated as Part 6 & 7 in the Diagram. Part 6 is Digital Volt meter which displays the output D.C. Voltage. Part No.7 is Digital Amp. Meter which displays the output current.

Step Six:- At this stage, the operator will notice the Over Current/Reset Indicator L.E.D., which will glow red and the Buzzing sound will be there. Now the operator is required to push the Reset Switch to ON. The Reset Switch has been indicated as Part No.5 in the Diagram. It has been referred as process start & over current Reset Switch also.

As soon as this is done, the operators job to start the rectifier unit is finished. The Rectifier starts to deliver required voltage and current to the electrodes. This will continue up to 480 minutes. As soon as the Timer unit displays 480 minutes of the operation completed, the Rectifier unit will automatically trip and stop the output to the Electrodes.

If the mains ON/Off Switch/M.C.B. trips as soon as it is put to ON, please contact the technical service department of Electroset Aqua Purifiers Ltd., Delhi.

 
 
 